Reduce Stormwater Runoff In Anna Maria
Phase I Storm Water Drainage
Phase I Storm Water Drainage Update
On 2/11/08 Adkins Construction will be adding the center line in the alleys for Phase I work.
On 2/12/08 BDI surveyors will be conducting surveys at
Listed below are the following areas for public information to the residents regarding Storm Water Improvements. The workshop will be hearing input from residents of these areas. Also, please see attached aerial photo.
On — From — To:
- Gulf Dr — Pine Ave — Maple Ave
- Palmetto Ave — Gulf Blvd — N. Shore Dr
- Pine Ave — Gulf Dr — South Bay Blvd
- Hardin Ave — N. Shore Dr — East End
- Spring Ave — Spring Lane — South Bay Blvd
- Willow Ave — N. Shore Dr — East End
- Magnolia Ave — Gulf Blvd — South Bay Blvd
- Crescent Dr — Lake LaVista — Palm Ave
- N. Shore Dr — Elm Ave — Willow Ave
- Maxine — Magnolia Ave — Palm Ave
- Palm Ave — Gulf Blvd — Maxine